SOP for Preventive Maintenance of Steam Boiler EN-14

SOP for Cleaning and Preventive Maintenance of Steam Boiler is to establish a standardized procedure for the cleaning and preventive maintenance of steam boiler, ensuring their safe and efficient operation, reducing the risk of breakdowns, and extending their operational lifespan.Cleaning and Preventive Maintenance of Steam Boiler

SOP for Cleaning and Preventive Maintenance of Steam Boiler

  • OBJECTIVE:
    • To lay down the Procedure for cleaning & Preventive Maintenance of Steam Boiler installed in utility area.
  • SCOPE:
    • This SOP is applicable to cleaning & preventive maintenance of Steam boiler installed in utility area.
  • RESPONSIBILITY:
    • Technician/ Operator – Engineering shall be responsible for Preventive Maintenance of Steam Boiler.
    • Head – Engineering shall be responsible for ensuring compliance of the SOP.
  • ACCOUNTABILITY:
    • Engineering – Head shall be accountable for proper implementation of the SOP for Preventive Maintenance of Steam Boiler.
  • DEFINITIONS:
    • SOP for Cleaning and Preventive Maintenance of Steam Boiler: A detailed and standardized set of instructions outlining the step-by-step procedures to be followed for the regular cleaning and preventive maintenance of steam boilers. This SOP aims to ensure the safe and efficient operation of steam boilers by providing guidelines for visual inspections, combustion system checks, safety device testing, cleaning of internal components, water treatment analysis, comprehensive inspections, efficiency testing, and calibration. Adhering to this SOP minimizes the risk of breakdowns, enhances boiler performance, extends its operational lifespan, and maintains the overall integrity of steam boilers used in various industrial processes and heating applications.
  • PROCEDURE:
    • Preventive maintenance shall be executed as per the SOP No.: SOP/EN/XXXYYY – Execution of Preventive Maintenance.
    • Ensure that the spare parts are available before start of preventive maintenance activity.

Preventive Maintenance of Steam Boiler Schedule and Check List

  • Monthly Preventive Maintenance:
    • Check steam pressure switch operation.
    • Check mobrey level controls for pump on-off operation.
    • Clean strainers in feed pump suction line.
    • Check safety valve operation.
    • Check motor electrical connection for burner, feed pumps, fuel feed pumps and main pumps.
    • Clean the boiler smoke tubes.
    • Check all relief valves for leakages.
    • Check pilot and burner assemblies and examine for mineral or corrosion build up.
    • Inspect the boiler air leaks and check the damper seals.
    • Inspect all the linkages on combustion air dampers.
    • Check the blow down and water treatment procedure. Determine the blow down is accurate to prevent solids build up.
    • Check the gasket for tight sealing and replace them if necessary.
    • Check hooter operations.
    • Check motor interlocks.
    • Check the stock of essential spares.
    • Clean the furnace.
    • Check the electrical contactor contacts.
    • Check the burner rod and burner rod assembly.
    • Check cleaning of oil filter.
    • Checking of photocell.

Quarterly Preventive Maintenance of Steam Boiler:

SOP for Operation of Steam Boiler
  • Check the feed line check / non return valve.
  • Remove the dust from electrical control panel.
  • Check front reversal chamber refractory and repair if required.
  • Grease all motor’s bearings, if required.
  • Check the condition of smoke box sealing rope, if found damage then replace.

 

Half Yearly Preventive Maintenance of Steam Boiler:

  • Clean ‘the electrical panel from outside and inside with air blower.
  • Clean the view glass properly.
  • Check the feed pump for leakage.
  • Clean the strainers, electrode & burner nozzle.
  • Check the valves for any leakage.
  • Clean the tubes with wire brush.
  • Check the tightness of the impeller fans.
  • Open the man hole door and check for the scale formation if any scale is observed remove it.
  • Clean the mobrey float valve.
  • Check refractory for any damage and carry out its repair work if required.
  • Clean the chimney and remove carbon.

Yearly Preventive Maintenance of Steam Boiler:

  • Carry out all the half yearly check points.
  • Inspection of the boiler will be carried out with the government authorities.
  •  
Checking of spare parts
  • Check the stock of following recommended spare parts
Sr. No.Component DescriptionQuantity  (Nos.)
1Air break switches for mobrey2
2Float rod assembly for mobrey1
3Hooter Control Panel1
4Indicating Lamp holder2
5Indicating Lamps12
6Feed Water Pumps1
7IBR pressure gauge 10” dial for boiler1
8Fusible plug2
9Blow down valve IBR1
10Non return valves feed line IBR1
11Gauges glass assembly IBR1
12Gauge glass2
13Quick shut off valve size1
13.1Burner Spares 
14Fuel Pressure gauge1
15Burner nozzle  as per consumption Kg/ hr1
16Sequence controller Siemens1
17Photo resister1
18Sight glass burner2
19View glass rear2
20Ignition transformer1
21Burner gun1
22Pressure switch high pressure cut off1
23Proportional pressure controller1
24Rectifier1
25Burner Diffuser Plate1
26Burner Solenoid valve1
27Fuel Pump1
28Feed back potentio-meter1
29Servomotor1
30Electrode assembly2
31Electrode Cap2
 31.1Burner Spares 
32Gas pressure gauge Range 1 – 10 bar1
33Gas pressure gauge range 0 – 100 Mbar1
34Main gas pressure regulator range 1 – 4 bar1
35Main gas burner solenoid valves2
36Gear train assembly for gas regulation1
37Pilot burner solenoid valve1
38Pressure switch gas pressure high1
39Pressure switch gas pressure low1
40Diffuser plate1
41Sequence controller1
42UV cell1

Preventive Maintenance of Steam Boiler Check List

Preventive Maintenance of Boiler Scrubber
  • Post Preventive Maintenance Check List
    • Record the PM details as per the Format No.: SOP/EN/XXXYYY “Preventive Maintenance Checklist & Record for Steam Boiler”.
    • Whenever any modifications and major works are carried out to the equipment, the same shall be mentioned in the equipment history card as per the respective SOP.
    • Connect the equipment main power supply and start the equipment.
    • Ensure that the equipment is running smoothly, without any abnormality.
    • If any abnormality is observed in the above, same will be attended in co-ordination with User department Head.
  • ABBREVIATIONS
    • CRF No.   :     Change Request Form number
    • QA            :     Quality Assurance
  • REFERENCES
    • Operational & Maintenance Manual of Steam Boiler.  
  • DISTRIBUTION LIST

  SOP shall be distributed to following departments Quality Assurance, Engineering as per user     request

  • ANNEXURES
    • Preventive Maintenance checklist & Record For Steam Boiler:  SOP/EN/XXXYYY

Check List & Records Preventive Maintenance of Steam Boiler

CHECKLIST & RECORD

Equipment Name BoilerLocation 
Equipment ID Frequency 
Maintenance activityCheckRemark
Monthly Preventive Maintenance  
Check steam pressure switch operation.  
Check mobrey level controls for pump on-off operation.  
Clean strainers in feed pump suction line.  
Check safety valve operation.  
Check motor current for burner feed pumps______; fuel feed pumps______ and ring main pumps_________. (Set value current) (Observed value for burner feed pumps______; fuel feed pumps______ and ring main pumps_________)  
Clean the boiler smoke tubes.  
Clean the smoke tubes and furnace.  
Check the furnace combustion air chamber is free from leakages.  
Check the electrical contactor contacts.  
Checking of burner and burner rod assembly.  
Cleaning of oil filter.  
Checking of photocell.  
Quarterly Preventive Maintenance  
Check the feed line check / non return valve.  
Remove the dust from electrical control panel.  
Check front reversal chamber refractory and repair if required.  
Grease all motor bearings, if required.  
Check the condition of smoke box sealing rope, if found damage replace  
Half Yearly Preventive Maintenance  
Clean the electrical panel from outside and inside with air blower.  
Clean the view glass properly.  
Check the feed pump for leakages.  
Clean the strainers; electrode and burner nozzle.  
Check the valves for any leakage.  
Clean the tubes with wire brush.  
Check the tightness of the impeller fans.  
Open the man hole door and check for the scale formation if any scale is observed remove it.  
Clean the mobrey float valve.  
Check the refractory for any damage and carry out its repair work if required.  
Clean the chimney and remove carbon.    
Yearly Preventive Maintenance  
Check out all the half year check points.  
Inspection of boiler will be carried out with the government authorities.  
Open the man hole cover and cleaned in side with wire brush.  
Check for the safety instrument operation.   
Air Compressor

You may also read about Good Laboratory Practices (GLP)

Leave a Comment