The objective of this Standard Operating Procedure of preventive maintenance of compactor is to outline the steps and guidelines for conducting preventive maintenance on a compactor to ensure its optimal performance, safety, and longevity.
SOP for Preventive Maintenance of Compactor
- OBJECTIVE:
- To lay down the Procedure for preventive maintenance of Compactor installed in QA/Warehouse area.
- SCOPE:
- This SOP is applicable to preventive maintenance of pumps installed in QA/Warehouse area.
- RESPONSIBILITY:
- Technician/ Operator shall be responsible for proper execution of preventive maintenance as per SOP.
- Engineering – Head shall be responsible for reviewing the SOP and for ensuring proper execution of preventive maintenance
- ACCOUNTABILITY:
- Engineering – Head shall be accountable for proper implementation of the SOP.
- DEFINITIONS:
- Nil
- PROCEDURE:
- Preventive maintenance shall be executed as per the SOP No.: SOP/EN/XXXYYY – Execution of Preventive Maintenance.
- Ensure that the spare parts are available at the time of preventive maintenance.
- Preventive Maintenance
- Check the door handle for smooth operation and locked.
- Check the railing for any damage.
- Lubricate railing if required.
- Check the wheel condition for smooth operation. Replace if required.
- Lubricate the Chain and sprockets.
- Checking shall be done half yearly ±15 days.
- Post Preventive Maintenance – Check List in preventive maintenance of Compactor.
- Whenever any modifications and major works are carried out to the equipment, the same shall be mentioned in the equipment history card as per the respective SOP.
- Ensure that the equipment is running smoothly, without any abnormality.
- If any abnormality is observed in the above, same will be attended in co-ordination with User department Head.
- Record the preventive maintenance activity as per the format No : SOP/EN/XXXYYY Preventive maintenance check list & record.
- ABBREVIATIONS
- CRF No. : Change Request Form number
- QA : Quality Assurance
- PM : Preventive Maintenance
- EN : Engineering
- REFERENCES
- Nil.
- DISTRIBUTION LIST
- SOP shall be distributed to following departments Quality Assurance, Engineering as per user request.
- ANNEXURES
- Preventive Maintenance Checklist & Record for Compactor : SOP/EN/XXXYYY
PREVENTIVE MAINTENANCE CHECKLIST & RECORD FOR COMPACTOR
Equipment Name | Location | ||
Equipment ID | Frequency |
Things to be done: | Check List | Remarks |
Half Yearly Check List | ||
1. Check the door handle for smooth operation and locked | ||
2. Check the railing for any damage. | ||
3. Lubricate railing if required. | ||
4. Check the wheel condition for smooth operation. Replace if required. | ||
5. Lubricate the Chain and sprockets. |