Installation Qualification IQ of RMG

INSTALLATION QUALIFICATION IQ of RMG

DETAILS OF EQUIPMENT/ SYSTEM
User DepartmentPRODUCTION
Stage of QualificationINSTALLATION QUALIFCATION
Equipment/System ID 
Equip. LocationGRANULATION ROOM
Equip. Make 
Equip. Serial No. (Supplier) 

TABLE OF CONTENT

1.0      PRE APPROVAL.

2.0      OBJECTIVE.

3.0      SCOPE.

4.0      EQUIPMENT / SYSTEM DESCRIPTION:

5.0      RESPONSIBILITIES.

6.0      PRE-REQUISITE.

7.0      METHODOLOGY.

8.0      DISCREPANCY AND CORRECTIVE ACTION REPORT.

9.0      ANNEXURE.

10.0    SUMMARY.

11.0    CONCLUSION.

12.0    ABBREVIATIONS.

13.0    REFERENCES.

14.0    POST APPROVAL.

Change History
DateVersionCC Ref No.Revision summary
 00 New document
  1. PRE APPROVAL:

Signing of approval page of this document indicates the agreement with the Qualification approach described in this document. If any modification approach becomes necessary, a revision through change control shall be prepared, checked and approved. This document cannot be executed unless approved.

NameDesignationDepartmentSignature /date
Prepared by
          
Reviewed by
          
Approved by
          
  • OBJECTIVE:

The objective of this Installation Qualification Document is to provide guidelines for verification of static attributes of Rapid Mixer Granulator ID No:  , Installed at XXX  Limited.

  • SCOPE:

The scope of this Document applies for the Installation qualification of Rapid Mixer Granulator ID No:  , by following the below mentioned test functions.

  • Verification of Equipment Specification
  • Identification and Verification of Supporting Utilities
  • Verification of Equipment Installation
  • Identification and Verification of Measuring Devices
  • Identification of Programmable functional keys, Displays, Safety Features & Interlocks
  • Identification and Verification of Documents
  • Identification of Standard Operating Procedures
  • Verification of Major Components & Accessories
  • Verification of Specification of Major Components & Accessories
  • Verification of Material of Construction.
  • EQUIPMENT / SYSTEM DESCRIPTION:

RMG is mixing and granulating machine used for mixing and granulating powder with binder.

In RMG, main impeller maximizes micro mixing of ingredients by effecting optional diffusion correction. Irrespective of varying bulk densities, both during dry & wet mixing also chopper act for distribution of binder fluid and helps to from granules.

Rapid Mixer Granulator is designed to match all the requirements of cGMP. All components are easy to dismantle and to assemble for accessibility in cleaning. Unit is most ideal for dry and wet mixing and wet granulation mixing. Product bowl is provided with openable lid and required safety interlocks. The Motor speed is controlled through variable frequency drive.

  • RESPONSIBILITIES:

The group comprising of representatives from each of the following departments shown in the table below and they shall be responsible for the overall compliance with this document.

DepartmentResponsibility
EngineeringExecute the qualification activity where ever applicable and recording installation data as per the procedures outlined in this document.
UserExecute the qualification activity where ever applicable and provide necessary support during the Installation qualification of the system.
Vendor’s representativeExecute the qualification activity where ever applicable during the Installation qualification
Quality AssurancePreparation of document and data sheets in consultation with engineering department. Training and approval of the document.Monitoring the qualification activities. Compilation, review of the data and approval of the documents and its compliance to meet the acceptance criteria.
  • IDENTIFICATION OF EXECUTORS

Person involved in the execution of the document shall be trained on the concept of validation

S. NoName of the ExecutorDepartment & DesignationSign & Date
    
    
Verified by ( QA):
  • PRE-REQUISITE:

Training: Before processing for the qualification, the respective validation team shall be trained on the concept of validation. The training document shall be verified and shall be satisfactory

(Refer attachment for training record)

  • METHODOLOGY:

Following test procedures are followed to qualify the equipment for its installation.

  • VERIFICATION OF EQUIPMENT SPECIFICATION

Objective: To verify the equipment details against design data.

References & Tools required:

GA Layout

Measuring Tape

Procedure:

  • check the system nameplate / identification plate is clearly visible.
  • Verify the make, model no. & size of the equipment from the nameplate; record the serial no. and location of the equipment in the observation column of data sheet.
  • Measure the dimensions using a measuring tape.
  • For each component verified or recorded, indicate the method used in performing the verification in the “verification methodology” column as follows:
  • Visual verification of actual installation – “Visually Verified”
  • Verification through cross-referencing the manufacturer information
  • Physical verification of actual installation – “Physically Verified”.

Acceptance criteria: The observed details for the given parameters should be same as per the manufacturer’s specifications. The measured dimensions should be within ±10% of specification.

Recording of Observations:

Parameter / DescriptionSpecificationObservationVerification methodologyChecked by Sign /date
System name plateShould be clearly visible   
Make    
Model    
S.No.    
Capacity (Gross volume)5 Kg eg.   
LocationGranulation Room   

 Meet the acceptance Criteria [           ] Yes                            [           ] No

 Remarks:

 Reviewed by: ____________________                    Date: ______________________

  • IDENTIFICATION AND VERIFICATION OF SUPPORTING UTILITIES

Objective: To identify and verify that all the utilities are installed to the equipment properly and are in compliance with the specifications.

References & Tools required:

  • Functional / system specification
  • Multimeter / Clamp Meter
  • Electrical & Mechanical Schematics

Test procedure:

  • Perform a visual inspection of the equipment support utilities listed on the below table.  Verify specified requirements for the equipment for each utility and record the actual information in the “actual” column on the data collection sheet(s). Verification should be made through visual inspection of the physical installation, nameplate information, and/or system instrumentation.
  • Record, for informational purposes only, the actual information for the parameter(s) that has not been specified.
  • For each parameter(s) that cannot be visually verified, the specified parameter must be verified through independent sources of information provided by the vendor/ manufacturer (i.e. specification sheet, name plate, signed/dated letter from manufacturer/vendor or approved drawing).  All sources of information must be documented on the table or an itemized cross reference list and attached to the protocol in the appropriate annexure. 
  • All instrumentation used in this verification must be calibrated prior to testing and a copy of the metrology calibration certificate shall be available at facility and/or attached to the document in the appropriate annexure.
  • Record all observations in the below table. Record the details of instruments used for testing purpose.
  • For each component verified or recorded, indicate the method used in performing the verification in the “Verification Methodology” column as follows:
  • Visual verification of actual installation – “Visually Verified”
  • Verification through cross-referencing the manufacturer information
  • Physical verification of actual installation – “Physically Verified”.

Acceptance Criteria:

  • Each utility of the equipment, listed on the data sheets, shall be installed in accordance with the equipment specification. All parameters shall be in compliance with the equipment specifications. No leakages should be observed.
  • All the utilities and drains should be connected without any leakage. Slope should be maintained wherever required.

Recording of Observations:

  1. Electrical: 
TypeSpecification  / RecommendationActualVerification methodologyChecked by Sign /dateVerified by Sign /date
Voltage 415V± 10%    
Frequency 50 Hz    
Phase3 Phase    
  • Non Electrical:
TypeSpecification  / RecommendationActualVerification methodologyChecked by Sign /dateVerified by Sign /date
Compressed airShall be available    

Reference Instruments Details:

Instrument detailsCalibration detailsChecked by Sign /Date
NameRangeDone ONNext DueCertificate no.
      
      

   Meet the acceptance Criteria           [           ] Yes                            [           ] No

   Remarks:

    Reviewed by: ____________________                            Date: ______________________

  • VERIFICATION OF EQUIPMENT INSTALLATION

Objective:

To verify that the equipment (including sub-components & accessories) is properly installed as per the manufacturers specifications / equipment requirements.

References & Tools required:

  Spirit level indicator

Test procedures:

  • Levelling and installation: Using a spirit level indicator check the levelling of the equipment in both the directions. Check and verify that the equipment has been installed as per the drawings.
  • Cleanliness: Visually check that the equipment is cleared of any debris and cleaned.
  • Electrical connections: Check and verify physically that the electrical connections are connected properly; also check for the earthing of the same by comparing with the wiring diagrams / appropriate references. Also verify that all the wires / connections are properly identified and numbered and that there are no loose unidentified wires present.
  • Labelling: Check and verify physically that all components labelled and direction of flow (wherever applicable) properly.
  • Physical damage: Check and verify physically that no physical damage has occurred to equipment, components, measuring devices (if any) and record the observations.

Acceptance criteria:

  • Levelling and Installation: Equipment is securely anchored and levelled properly. The equipment should be installed as per the specifications and respective drawings.
  • Cleanliness: All access ports are examined and cleared of any debris.
  • Electrical Connections: The electrical wiring should be as per the electrical diagrams and all the terminals / wires / connections should be identified and appropriately numbered and there should not be any loose unidentified wires present in the equipment. Wiring diagram should be taped to inside the panel.
  • Labelling: All the components (which required) shall be labelled and direction of flow is mentioned wherever is applicable.
  • Physical damage: No physical damage shall be observed for all components of the system.

 Recording of Observations:

ParameterSpecificationObservationVerification methodologyDone by Sign /dateVerified by Sign /date
LevellingEquipment is securely anchored and levelled properly    
CleanlinessAll access parts are examined and cleared of any debris    
Earthing and connectionsElectrical wiring is as per the drawings and all wires / terminals identified and numbered properly. No loose unidentified wires present.    
LabellingAll the components shall be labelled and direction of flow is mentioned wherever is applicable.    
Physical damageNo physical damage shall be observed for all components of the system.    

Meet the acceptance Criteria  [           ] Yes                            [           ] No

Remarks:

Reviewed by: ____________________                                 Date: ______________________

  • IDENTIFICATION AND VERIFICATION OF MEASURING DEVICES

Objective: To identify and verify the measuring device present in the equipment.

References & Tools required: Not applicable.

Test procedure:

  • Identify the measuring devices fixed on the equipment. Check that the measuring devices nameplate / identification plate is clearly visible. Verify and record details of the make, type, range, Serial no. and location of the measuring devices
  • After identification and verification, the device shall be numbered as per the respective SOP.
  • Verify the calibration certificates for each identified measuring device (if available)

Acceptance criteria:

  • Each measuring device should be complying with the specifications.
  • No physical damage shall be observed for all components of the system.

Note: If any measuring device is not calibrated / not in the validity shall arrange for Calibration by using internal or external facility.

    Recording of Observations:

Name of the componentInstrument ID.LocationMakeModelRangeFrequencyDone by Sign/ DateChecked by Sign/ Date

   Remarks:

   Reviewed by: ____________________                                                                Date: ______________________

  • IDENTIFICATION OF PROGRAMMABLE FUNCTION KEYS, DISPLAYS, SAFETY FEATURES & INTERLOCKS 

Objective: To identify the programmable function keys, displays,safety features & interlocks present with the equipment/system.

References & Tools required: Not applicable.

Test procedure: Visually identify all the programmable function keys, displays,safety features and interlocks present with the equipment as per the specifications / manufacturer instructions and visually verify the same to ensure that they are connected properly and free from any physical damage.

Acceptance criteria: Each programmable function keys, displays,safety features & interlocks available should be connected as per the specifications.

Recording of Observations:

Name of the Programmable Function Keys and DisplaysPresent Yes / NoVerification MethodologyChecked by Sign /dateVerified By Sign /date
Emergency stop    
Main on/off switch    
Volts and Amps display    
Other if any:    

Meet the acceptance Criteria  [           ] Yes                            [           ] No

Remarks:

Reviewed by: ____________________                     Date: ______________________

  • IDENTIFICATION AND VERIFICATION OF DOCUMENTS

Objective: To identify and verify all the documents associated with the equipment are available.

                    References & Tools required: Not applicable.

Test procedure: 

  • Verify the availability of various general documents as mentioned in the Table.
  • Record the documents details and locations at which documents are available in respective columns
  • Relevant documents shall be maintained at the facility and a copy may be attached to the protocol as an annexure.

Acceptance criteria:

All the documents shall be available at the time of execution of this protocol.

 Recording of Observations:

TitleDocument NoAvailable Yes/ NoChecked by Sign /dateVerified By Sign /date
Purchase Order    
URS    
Design qualification    
Operational and maintenance manual    
Equipment G.A/mechanical    
Electrical drawings    
Instrument calibration certificates if any    
Any other    

  Remarks:

 Reviewed by: ____________________                    Date: ______________________

  • IDENTIFICATION OF STANDARD OPERATING PROCEDURES

Objective: To identify the SOP’s for the equipment.

References & Tools required:

Not applicable.

Test procedure: Identify all the relevant SOP’s for operation, cleaning, preventive maintenance and calibration of the system. Draft copy of the SOP’s identified should be prepared based on the instructions / guidelines provided in the operating and maintenance manual.

Acceptance criteria: All SOP’s should be identified for all the identified processes.

Recording of Observations:

S.NoProcedureTitleChecked by Sign /dateVerified by Sign /date
     

 Remarks:

Reviewed by:  Date:

  • DISCREPANCY AND CORRECTIVE ACTION REPORT:

Document the discrepancies observed during the Installation qualification of the equipment in the below mentioned table.  When all the discrepancies are satisfactorily resolved or an approved action plan is developed which ensures that the discrepancy will be resolved, document that the system is ready for next step in the qualification.

  • Deviation
  • Impact on operation
  • Justification for acceptance

      Prepared by                              Reviewed by                                         Approved by

      Sign/ date:                                Sign/ date:                                             Sign/ date:                              

  • ANNEXURE:
S. No.Name of AnnexureAnnexure No.
 Purchase Order 
 Drawings 
 Measuring Device 
 MOC Certificates 
 Other if any 
  • SUMMARY:
  • CONCLUSION:
  • ABBREVIATIONS:
AbbreviationsDescription
IQInstallation Qualification
S.No.Serial Number
SOPStandard Operating Procedure
RMGRapid Mixer Granulator
  1. REFERENCES:
  2.  Design qualification of Rapid Mixer Granulator
  3. Validation Master Plan

POST APPROVAL:

 Signing of Report page of this document indicates the acceptance of Installation Qualification   approach described in this document.

INSTALLATION QUALIFICATION REPORT FOR RAPID MIXER GRANULATOR RMG-01 (REV-00) 800 L

Installation Qualification IQ of RMG and its technical specification:

   Prepared by:

DepartmentName & DesignationSignatureDate
  

   Reviewed by:

DepartmentName & DesignationSignatureDate
  

   Approved by:

DepartmentName & DesignationSignatureDate
  

DATASHEET – A

      Date: ___________

Specification of the equipment for all components required against the Purchase Order specifications

S.NoDescriptionDesign SpecificationsAcceptance CriteriaObservationMethod of Verification
1Rapid Mixer Granulator
Capacity800 L800 L  
Contact PartsSS316SS316  
Non-Contact PartsSS304SS304  
Length2400 mm2400 ± 10 mm  
Width2600 mm2600 ± 10 mm    
Height With Lid opening.3750 mm3750 ± 10 mm  
GasketsFood grade siliconFood grade silicon  
Filter bagsPolypropylenePolypropylene  
2Main Motor
MakeHindustan Electric MotorsHindustan Electric Motors  
HP6060  
RPM14751475 ± 10   
Voltage (V)415V415 +/- 10%  
Type of ProtectionIP 55IP 55  
Frequency (Hz)5050  
DutyS1S1  
Temperature ClassT1 – T4T1 – T4  
S.NoDescriptionDesign SpecificationsAcceptance CriteriaObservationMethod of Verification
3Chopper Motor
MakeHindustan Electric MotorsHindustan Electric Motors  
HP10.010.0  
RPM29102910 ± 10  
Voltage (V)415V415 +/- 10%  
Type of ProtectionIP 55IP 55  
Frequency (Hz)5050  
DutyS1S1  
Temperature ClassT1 – T4T1 – T4  
4Co Mill Motor
MakeHindustan Electric MotorsHindustan Electric Motors  
HP55  
RPM14401440 ± 10%  
Voltage (V)415V415 +/- 10%  
Type of ProtectionIP 55IP 55  
Frequency (Hz)5050  
DutyS1S1  
Temperature ClassT1 – T4T1 – T4  
S.NoDescriptionDesign SpecificationsAcceptance CriteriaObservationMethod of Verification
5Gear box
MakeEleconElecon  
TypeWorm seriesWorm series  
Ratio10:110:1  
Size, Qty9”, 1 No9”, 1 No  
6SIEVES
MakePharma sparesPharma spares  
MaterialSS 316SS 316  
TypeConicalConical  
Size, Qty20 mm, 1 No20 mm, 1 No  
7Mobile Lifter
Non contact Exposed parts MOCSS304SS304  
Non contact Internal parts MOCMS parts wire brushed & paintedMS parts wire brushed & painted  
Hydraulic Power Pack Motor
MakeHindustan Electric MotorsHindustan Electric Motors  
HP1.51.5  
RPM14401440 ± 10%  
TypeFlange, 3 phaseFlange, 3 phase  
8Variator for main motor
MakeSchneiderSchneider  
HP6060  
S.NoDescriptionDesign SpecificationsAcceptance CriteriaObservationMethod of Verification
9Variator for chopper motor
MakeSchneiderSchneider  
HP1010                                                                                           
10Variator for co mill
MakeSchneiderSchneider  
HP55  
11HMI
MakeSchneiderSchneider  
ModelHMIHMI  
Meter DisplayTFT – LCD ColourTFT – LCD Colour  
MemoryFlash TypeFlash Type  
12PLC
MakeSchneiderSchneider  
ModelTM258LD42DT4LTM258LD42DT4L  
Input / Output4242  
Qty0101  
13Surface Finish
Internal240 Grit Mirror240 Grit Mirror  
External180 Grit Matt180 Grit Matt  

Verified by:

    Name                                 Signature                           Date      

DATA SHEET B

Date: ____________

Check whether the Process and Utility pipelines are connected as per P&ID

S.No.DescriptionDesign SpecificationsAcceptance CriteriaObservationMethod of Verification
UTILITY LINES
1Air15 NB, SS30415 NB, SS304  

Verified by:

Name                                     Signature                              Date

DATA SHEET C

Date: ____________

Check for electrical / instruments components and its accessories

Electrical:

S.NoDescriptionDesign SpecificationsAcceptance CriteriaObservationsMethod of Verification
  1.1Check proper               Electrical connection of Motor415 V, 3Ø415 V, 3Ø  
  1.2Check for earthing provided with motor and equipment2.5/25 Sq.mm multi strand double earthing copper2.5/25 Sq.mm multi strand double earthing copper  
          1.3Record the Name plate details of MotorMake : HMM            Make :        HMM    
Main motor HP: 60.0 Chopper motor HP: 10.0 Co mill motor HP: 5.0 LPD HP: 1.5Main motor HP: 60.0 Chopper motor HP: 10.0 Co mill motor HP: 5.0 LPD HP: 1.5  
Type : FLPType : FLP  
Main motor RPM: 1475 Chopper motor RPM: 2910 Co mill motor RPM: 1440 LPD RPM: 1440Main motor RPM: 1475+10 Chopper motor RPM: 2910+10 Co mill motor RPM: 1440+10 LPD RPM: 1440+10  
1.4CablingComill: 4 Core x 4     Sq. mm LPD: 4 Core x 1.5   Sq. mm HMI controller: 6 Pair  x 1.0   Sq. mm Chopper: 4 Core x 2.5   Sq. mm Main motor: 4 Core x 35   Sq. mmComill: 4 Core x 4     Sq. mm LPD: 4 Core x 1.5   Sq. mm HMI controller: 6 Pair  x 1.0   Sq. mm Chopper: 4 Core x 2.5   Sq. mm Main motor: 4 Core x 35   Sq. mm          

Instruments:

S.NoDescriptionDesign SpecificationsObservationsCalibration StatusMethod of Verification
OnDue
1Air Pressure GaugeRange:0-16 Bar Make: Festo    
2Hydraulic oil pressure GaugeRange:0-280 Kg/cm2 Make: Shreeji    
3Temperature SensorRange: -20 to 150°C Make: Patco    
RMG

Verified by:

Name                                 Signature                             Date

DATA SHEET- D

Date: ____________

Check for safety devices specifications against its design parameters

S.No.DescriptionDesign SpecificationsAcceptance CriteriaObservationsMethod of Verification
1Earthing  2.5 Sq.mm multi strand double earthing2.5 Sq.mm multi strand double earthing      
Strip MOC25 mm GI Flat/ Flexible25 mm GI Flat/ Flexible      

Verified by:

Name                                     Signature                             Date

DATA SHEET- E

Date: ___________

Equipment spacing and leveling

S.No.DescriptionDesign SpecificationAcceptance CriteriaObservationMethod of Verification
1Left0.8 m0.8 m + 0.1m  
2Right1.75 m1.75 m + 0.1m  
3Front1.7 m1.7 m + 0.1m  
4Back0.1 m0.1 m + 0.1m  
5Top1.2 m1.2 m  + 0.1m  
6Bottom0.3 m0.3 m + 0.1m  

Verified by:

        Name                                   Signature                                             Date

CONCLUSION:

Rapid mixer granulator system bearing Tag No RMG-01 is qualifying / is not qualifying the Installation qualification test as per the acceptance criteria described in this Protocol No 000111 Rapid mixer granulator system RMG-01 can be / cannot be tested for its Operational Qualification as per Protocol No-0000.

Verified by:

Name                                     Signature                         Date