SOP for Preventive maintenance of Boiler Scrubber EN-31

The objective of this Standard Operating Procedure preventive maintenance of Boiler Scrubber is to outline the steps and guidelines for conducting preventive maintenance on a boiler scrubber to ensure its optimal performance, compliance with environmental regulations, and safe operation.Preventive maintenance of Boiler Scrubber

SOP for Preventive Maintenance of Boiler Scrubber

  • OBJECTIVE:
    • To lay down the procedure for preventive maintenance of Boiler Scrubber installed in utility area.
  • SCOPE:
    • This SOP is applicable to preventive maintenance of Boiler Scrubber installed in utility area.
  • RESPONSIBILITY:
    • Technician/ Operator / Engineer shall be responsible for proper execution of preventive maintenance as per SOP.
    • Engineering – Head shall be responsible for reviewing the SOP and for ensuring proper execution of preventive maintenance of Boiler Scrubber.
  • ACCOUNTABILITY:
    • Engineering – Head shall be accountable for proper implementation of the SOP.
  • DEFINITIONS:
    • Nil
  • PROCEDURE:
    • Preventive maintenance shall be executed as per the SOP No.: SOP/EN/XXXYYY – Execution of preventive maintenance of Boiler Scrubber.
    • Ensure that the spare parts are available at the time of preventive maintenance of Boiler Scrubber.
  • Preventive maintenance of Boiler Scrubber – Mechanical
  • Clean strainers in water circulation pump
    • Switch off the water circulation pump.
    • Close the isolation valve of pump.
    • Open the flanges of strainer, remove the mesh; clean and replace if required.
    • Put the mesh inside the strainer, tight the nut and bolts of flanges.
    • Open the valve.
    • Cleaning frequency of strainer shall be after every month ± 5 days.
    • Check the operation of damper valve
    • Check and clean the flue gas duct damper valve; it should be easily closed and opened.
    • If the closing and opening movement is not properly, then open the damper valve.
    • Check for the gasket; if found damaged, cut, deform size and shape change then replace the gasket.
    • The checking of damper valve shall be after every three months ± 7 days.
  • Lubrication of motor bearings
    • Lubricate the pump and blower motor bearings with recommended lubricating grease.
    • The lubrication shall be done after every three months.
  • Check and clean the sprinkler nozzle
    • Check and clean the water sprinkler nozzle for proper water distribution.
    • Check the nozzles for tight connections and any leakages if required tighten the same.
    • Check and clean the flow strainer.
    • Check and inspect the flow pattern, so as there will not be weeping in the packed column.
    • Checking of nozzles shall be done after every six month ± 15 days.
  • Check of duct work
    • Check and clean the flue gas duct.
    • Check the end connection of flue gas duct; if required tightens the same.
    • Check and inspect the duct for any damage and deterioration.
    • Check the chimney for erosion and plugging.
    • Checking shall be done after every six month ± 15 days.
  • Checking and cleaning of the packed column
    • Check and inspect the any leakage; check for the tightness of end connections if required tight the same.
    • Check the gasket for damaged; cutting, deformation, leaching if required replace the same.
    • Clean the packing media, thoroughly cleaning with water.
    • Check the condition of media rings; inspect the packing for damage and settling if required replace the same.
    • Check the water re-circulation tank for sediment deposition; if required wash thoroughly form inside and flush out the dust.
    • Check the support strength and fasteners, if required tight the same.
    • Checking shall be done once in a year ± 30 days.
    • Check the nozzles for tight connections and any leakages if required tighten the same.
    • Check and clean the flow strainer.
  • Preventive maintenance of Boiler Scrubber – Electrical
  • Checking of Terminals and Wiring
    • Ensure that the power supply to the machine is switched off.
    • Visually check all the power and control wiring and terminals in the electric panel and on the field instruments.
    • Check and ensure by using screwdriver that all the wires are properly tightened.
    • Checking shall be done monthly ± 5 days.
  • Checking of motor
    • Physically check the insulation resistance of motor winding with the help of meagger.
    • Check the phase continuity and winding continuity of motor with the help of tong tester.
    • Physically check the motor terminal box and terminal connections.
    • Check the voltage drawn by motor with the help of multimeter.
    • Check the current drawn by motor with the help of tong tester.
    • Physically check the direction of rotation; it should be as per recommended direction.
    • Checking shall be done after every six month ± 15 days.
  • Checking of Contactors
    • Switch off the main switch on the electrical panel.
    • Remove all wires from the contactor.
    • Remove the contactor from the panel and visually check all the contacts for pitting and carbon deposits on the contacts.
    • Remove the dust from control panel with help of air blower.
    • Clean all the contacts with carbon tetra chloride (CTC) or with contactor cleaner.
    • Replace the contacts if found damaged or welded.
    • Put back the contactor in the panel and connect the wires in their respective panels.
    • Check the earthing of the panel body.
    • A good earthing shall show less than 2 Volts between the Neutral Wire of the Incoming Power supply and Panel Body.
    • Checking of contactors shall be done after every six month ± 15 days.
  • Post Preventive maintenance of Boiler Scrubber – Check List
    • Record the Preventive Maintenance details as per the Format No.: SOP/EN/XXXYYY“Preventive Maintenance Checklist & Record for Boiler Scrubber”.
    • Whenever any modifications and major works are carried out to the equipment, the same shall be mentioned in the equipment history card as per the respective SOP.
    • Connect the equipment main power supply and start the equipment.
    • Ensure that the equipment is running smoothly, without any abnormality.
    • If any abnormality is observed in the above, same will be attended in co-ordination with User department Head.
compression machine 1
  • ABBREVIATIONS:
    • CRF No.   :     Change Request Form number
    • QA            :     Quality Assurance
    • EN           :      Engineering
  • REFERENCES:
    • Execution of Preventive Maintenance                                       :    SOP/EN/XXXYYY
  • DISTRIBUTION LIST:
    • SOP shall be distributed to following departments Quality Assurance, Engineering as per user request.
  • ANNEXURES
    • Preventive Maintenance Record for Boiler Scrubber System            :           SOP/EN/XXXYYY
  •  

Check List and Records for the Preventive Maintenance of Boiler Scrubber

Equipment Name   Location  
Equipment ID   Frequency  
Things to be done: Check List Remarks
      Monthly check list    
Checking of terminals and wiring.    
Cleaning of strainer installed in suction line of pump.    
Quarterly Check List    
Checking of operation of damper valve.    
Half Yearly Check List    
Check and clean of the sprinkler nozzles.    
Check of duct work for erosion and plugging.    
Checking of electrical motors.    
Checking of contactors.    
Yearly Check List    
Checking and cleaning of the packed column.    
Cooling tower 02

You may also read about Good Laboratory Practices (GLP)

Leave a Comment

error: Content is protected !! please mail your query on flairpharma28@gmail.com we provide you the printed copy.